Soldier Piling and Lagging
Soldier pile walls are among the most cost-effective retention approaches for projects requiring less than about 15 vertical feet of retention in dewatered or dry soil conditions. They consist of steel H piles usually driven or drilled into the soil with wood lagging attached to the face of the piles.

Eli Lilly - Larossa
Project Location: Downtown Indianapolis, IN
Owner: Eli Lilly
Architect/Engineer: TLF Inc.
Completion Year: 2017

Hyatt Place - Hyatt House & Garage
Project Location: Downtown Indianapolis, IN
Owner: Indy Penn Center Hotel Owner, LLC
Architect/Engineer: RATIO Architects, Inc.
Completion Year: 2018

The Ardmore
Project Location: Downtown Indianapolis, IN
Owner: GP Deylen, LLC
Architect/Engineer: Blackline/CE Solutions
Completion Year: 2019